Mining
Water Wells Project
Location
Saskatchewan,
Canada
Contract Value
$68,000
Actual cost
Date of completion
3/25/2025
—
4/2/2025
Project Overview
Forged Drilling Co. was contracted to execute (4) 2-inch monitoring wells and (2) 5-inch water wells, each to a depth of 25 meters using the Air Rotary drilling method. The scope included a wireline E-log conducted on the water well, followed by a 24-hour pump test.
Drilling Services Provided
Drilling included four 2‑inch monitoring wells and two 5‑inch water wells, each to 25 m, totaling 150 m of drilling. Work was completed using an R401‑TH60 air rotary rig. Water wells were logged with wireline E‑logs and tested with a 24‑hour pump test. All wells were backfilled with 10/20 filter sand, sealed with bentonite chips, grouted to surface, developed for 6 hours, and step drawdown tested.
Principal
Project Details:
• 4 monitoring wells and 2 water wells
• E-logging
• Pump Test
• Backfill with filter sand, sealed with bentonite chips, and grouted to the surface
Get in touch
The ground will always do what the ground does. The only real question is whether the drilling contractor planned for it. The best outcomes start with a conversation.
— Jared Mills