Transmission Line Project
Location
Saskatchewan,
Canada
Contract Value
$75,000
Actual cost
Date of completion
9/4/2025
—
9/9/2025
Project Overview
The Transmission Line Project involved the provision of geotechnical drilling services in support of transmission line infrastructure development. The scope of work included a heli-portable drilling rig and support equipment to the remote site. Drilling operations incorporated overburden investigation and limited rock coring.
Drilling Services Provided
The services provided by Forged included the operation of a heli-portable drilling system to support geotechnical site investigation activities. This involved drilling of multiple boreholes to assess subsurface conditions. The program incorporated both overburden drilling and limited rock coring, along with in-situ testing through Standard Penetration Tests. Upon completion of drilling, all boreholes were properly decommissioned to meet environmental and regulatory requirements.
Principal
Project Details:
– Drilling of five (5) geotechnical boreholes.
– Boreholes advanced to approximately 12 m depth, including ~3 m of rock coring per location
– Standard Penetration Tests (SPTs) conducted at 1.5 m intervals in overburden materials
– Use of heli-portable drilling methods with rig moves completed via rubber-tired loader
– Remote site operations
Get in touch
The ground will always do what the ground does. The only real question is whether the drilling contractor planned for it. The best outcomes start with a conversation.
— Jared Mills