Contract Value
2500000
Actual cost
2500000
Date of completion
12/1/2025
—
2/24/2026
Project Overview
Tailings Drilling Project, a sonic drilling program designed to evaluate the contained mineral resource, was executed using two track-mounted sonic drill rigs (Rig 701 and Rig 703). The program consists of up to 500 boreholes totaling approximately 5,000 m of drilling. Borehole depths are expected to range from 10–30 m, with all holes drilled vertically to penetrate the full thickness of the tailings deposits.
Drilling Services Provided
Used 2 track-mounted sonic rigs (701, 703). Up to 500 bhs totaling approx 5000 m of vertical drilling. BH depths ranged from 10–30 m.
Principal
Project Details:
- 3 sites: 1 – 83 BH up to 766 m
- 2-193 BH up to 2571 m
- 3 -265 BH 570-977 m. 4-inch tooling
- SPT and gamma density testing
- PVC pipe for geophysical testing
- Frozen ground conditions
- Rig matts