Mining

Tailings Drilling Project

Location

British Columbia,

Canada

Contract Value

2500000

Actual cost

2500000

Date of completion

12/1/2025

—

2/24/2026

Project Overview

Tailings Drilling Project, a sonic drilling program designed to evaluate the contained mineral resource, was executed using two track-mounted sonic drill rigs (Rig 701 and Rig 703). The program consists of up to 500 boreholes totaling approximately 5,000 m of drilling. Borehole depths are expected to range from 10–30 m, with all holes drilled vertically to penetrate the full thickness of the tailings deposits.


Drilling Services Provided

Used 2 track-mounted sonic rigs (701, 703). Up to 500 bhs totaling approx 5000 m of vertical drilling. BH depths ranged from 10–30 m.

Principal
Project Details:

  • 3 sites: 1 – 83 BH up to 766 m
  • 2-193 BH up to 2571 m
  • 3 -265 BH 570-977 m. 4-inch tooling
  • SPT and gamma density testing
  • PVC pipe for geophysical testing
  • Frozen ground conditions
  • Rig matts

Get in touch

The ground will always do what the ground does. The only real question is whether the drilling contractor planned for it. The best outcomes start with a conversation.

— Jared Mills