Road Development Project

Location

Ontario,

Canada

Contract Value

$1,000,000

Actual cost

$--

Date of completion

4/1/2025

—

3/31/2026

Project Overview

The Road Development project, for Webequie and Marten Falls First Nations, involved environmental assessment and preliminary engineering for a proposed all-season road. Forged conducted heli-accessible geotechnical drilling to characterize subsurface conditions.


Drilling Services Provided

Forged performed heli-accessible geotechnical drilling services, including 26 boreholes to a maximum estimated depth of 15 m. Standard Penetration Tests were conducted. In clay deposits, Shelby tube sampling and field vane shear testing were performed. 20 peatland boreholes were drilled with SPT sampling to 3 m below peat or until bedrock, providing essential subsurface data for environmental assessment and preliminary engineering design.

Principal
Project Details:

  •  Heli-accessible geotechnical drilling
  • Drilled 15 boreholes for NRL and 11 boreholes for WSR, targeting a max depth of ~15 m.
  • Performed Standard Penetration Tests (SPTs)
  • Collected Shelby tube samples
  • Conducted field vane shear testing
  • Drilled 20 peatland boreholes