Project Overview
Forged Drilling was contracted to drill and install monitoring wells supporting construction of the ITA1 tailings facilities at the Oil Sands Operation. Using a sonic rig, the team drilled 24 boreholes, installed monitoring equipment, and completed hydraulic testing to support environmental and geotechnical needs.
Drilling Services Provided
Monitoring well installation and hydraulic testing.
Principal
Project Details:
• 2” Monitoring well installation
• 24 boreholes with a total drilled depth of 520m
• Grab samples every 1.5m
• SPT’s every 3m on select well
• Hydraulic testing
• Sonic Rig drilling capable of drilling 8” diameter holes.