Engineering & Consulting Firms
Mining Site
Location
Western Canada
Contract Value
$100,000
Actual cost
$100,000
Date of completion
7/29/2025
—
8/5/2025
Project Overview
Provide Geotech investigation and sampling within tailings management area including boreholes and CPT soundings.
Drilling Services Provided
Drilling was carried out within the tailings management area. The scope included conducting geotechnical drilling and sampling of the dyke fill and foundation soils. Forged provided Sonic Drill Rig to complete piezocone penetration (CPTu) services. The investigation tasks included drilling up to 110 m depth in total, collecting SPT sampling at various intervals and obtaining shelby tubes. Backfill boreholes with SPPA grout.
Principal
Project Details:
- Mobilize Sonic Drill Rig
- Push (5) x CPTs (10m)
- Drill (6) x 60 ft boreholes
- SPT sampling at 2.5′ intervals (0-15′), 5′ intervals (15 – 40′), 10′ intervals (40 – 60′)
- Collect 5 x shelby tubes per borehole
- Backfill boreholes with SPPA grout