Engineering & Consulting Firms

Mining Site

Location

Western Canada

Contract Value

$100,000

Actual cost

$100,000

Date of completion

7/29/2025

—

8/5/2025

Project Overview

Provide Geotech investigation and sampling within tailings management area including boreholes and CPT soundings.


Drilling Services Provided

Drilling was carried out within the tailings management area. The scope included conducting geotechnical drilling and sampling of the dyke fill and foundation soils. Forged provided Sonic Drill Rig to complete piezocone penetration (CPTu) services. The investigation tasks included drilling up to 110 m depth in total, collecting SPT sampling at various intervals and obtaining shelby tubes. Backfill boreholes with SPPA grout.

Principal
Project Details:

  • Mobilize Sonic Drill Rig
  • Push (5) x CPTs (10m)
  • Drill (6) x 60 ft boreholes
  • SPT sampling at 2.5′ intervals (0-15′), 5′ intervals (15 – 40′), 10′ intervals (40 – 60′)
  • Collect 5 x shelby tubes per borehole
  • Backfill boreholes with SPPA grout

Get in touch

The ground will always do what the ground does. The only real question is whether the drilling contractor planned for it. The best outcomes start with a conversation.

— Jared Mills