Mining

Mining Operations Project

Location

Ontario,

Canada

Contract Value

$360,000

Actual cost

Date of completion

1/1/2026

—

2/9/2026

Project Overview

The Mining Operations program involved the engagement of Forged Drilling to support groundwater infrastructure works. The scope of work included the installation of water wells and the decommissioning of existing wells, completed in accordance with Ontario Regulation 903 (Wells) under the Ontario Water Resources Act.


Drilling Services Provided

Forged Drilling provided licensed water well installation and decommissioning services across sites. The scope included the drilling of boreholes across the three sites, ranging in depth from approximately 10 m to 265 m. Forged completed the installation of 22 water wells and the decommissioning of 13 existing wells, All activities were carried out to ensure full regulatory compliance while supporting ongoing site water management and monitoring requirements.

Principal
Project Details:

  • Site 1: drilled 9 boreholes (up to 265 m) and converted to monitoring wells; decommissioned 8 wells up to 95 m.
  • Site 2: drilled 6 boreholes (up to 120 m) and converted to monitoring wells; decommissioned 5 wells up to 86 m.
  • Site 3: drilled 4 boreholes (up to 100 m) and converted to monitoring wells; decommissioned 4 wells up to 19 m.

Get in touch

The ground will always do what the ground does. The only real question is whether the drilling contractor planned for it. The best outcomes start with a conversation.

— Jared Mills