Mining
Mine Monitoring Project
Location
Saskatchewan,
Canada
Contract Value
$205,000
Actual cost
Date of completion
6/3/2024
—
6/21/2024
Project Overview
The client conducts ongoing monitoring of its Tailings Management Area (TMA) using piezometers and slope inclinometers. As part of the 2024 program, Forged completed the drilling, sampling, and installation of new monitoring instruments to support monitoring and stability analysis.
Drilling Services Provided
To support coarse tailings pile and dyke monitoring, stability modelling, and deposition planning at the TMA, additional instrumentation and site investigation were required. As part of the 2024 drilling program, Forged completed dual rotary drilling of five boreholes, totaling 345 m, including 190 m within coarse tailings. Each borehole yielded 6–7 soil samples for laboratory testing, and all holes were properly backfilled and grouted to ensure site stability and environmental compliance.
Principal
Project Details:
- Dual Rotary Drilling of (5) boreholes.
- Combined total of 345m
- 190m of coarse tailing (CT)
- 6-7 Samples per borehole
- Backfill and grout
Get in touch
The ground will always do what the ground does. The only real question is whether the drilling contractor planned for it. The best outcomes start with a conversation.
— Jared Mills