Construction

Geothermal Project

Location

Ontario,

Canada

Contract Value

$400,000

Actual cost

Date of completion

1/17/2025

—

2/4/2025

Project Overview

Forged Drilling Co. performed geothermal borehole drilling using air rotary methods, supplying and installing SDR11 HDPE U‑bend loops. Boreholes were stabilized with temporary casing, then grouted with high‑quality 1.1 TC grout to ensure proper thermal conductivity and reliable system performance.


Drilling Services Provided

Drilling included 20 geothermal boreholes, each 850 feet deep, for a total of 17,100 feet. Work was completed using an R402‑TH60 drilling rig suited for deep air rotary drilling. During operations, 4,800 feet of casing was installed to maintain borehole stability during loop installation and grouting.

Principal
Project Details:

• 20 Geo exchange boreholes
• Supply of U-bends – SDR11 HDPE geothermal loops
• Installation of U-bends
• Casing during drilling and retracted after grouting
• Supply and installation of 1.1 TC Grout

Get in touch

The ground will always do what the ground does. The only real question is whether the drilling contractor planned for it. The best outcomes start with a conversation.

— Jared Mills