Geotechnical Bridge Project
Location
Saskatchewan,
Canada
Contract Value
$188,000
Actual cost
Date of completion
6/23/2025
—
8/17/2025
Project Overview
Forged Drilling was contracted to provide geotechnical drilling along the bridges, for a total of 17 bridges.
Drilling Services Provided
Forged Drilling progressed 100 ft depth stem auger boreholes at each of the bridge locations. A minimum of two (2) borings were required, one near each abutment for bridge length greater than 80 ft, and one bore for bridges with length less than 80 ft. A total of 17 bridges. Standard Penetration Testing (SPT) was conducted in each borehole to assess the soil strength and allow sampling of the soils.
Principal
Project Details:
- Drill 100 ft depth stem auger boreholes at each of the bridge locations
- A total of 17 bridges
- HQ Core from 50 – 60ft with 5 ft core intervals
- Probe hole to 50ft depth. Push CPT equipment