Geotechnical Bridge Project

Location

Saskatchewan,

Canada

Contract Value

$188,000

Actual cost

Date of completion

6/23/2025

—

8/17/2025

Project Overview

Forged Drilling was contracted to provide geotechnical drilling along the bridges, for a total of 17 bridges.


Drilling Services Provided

Forged Drilling progressed 100 ft depth stem auger boreholes at each of the bridge locations. A minimum of two (2) borings were required, one near each abutment for bridge length greater than 80 ft, and one bore for bridges with length less than 80 ft. A total of 17 bridges. Standard Penetration Testing (SPT) was conducted in each borehole to assess the soil strength and allow sampling of the soils.

Principal
Project Details:

  • Drill 100 ft depth stem auger boreholes at each of the bridge locations
  • A total of 17 bridges
  • HQ Core from 50 – 60ft with 5 ft core intervals
  • Probe hole to 50ft depth. Push CPT equipment